First transformer

Wall was removed prior to our arrival to enable lifter access, to remove old transformer and put new one in place.

New transformer landed in a new position to ensure LV tails reached, as we could not gain any length on them.

Also had to remove steelwork and adjust to suit new cable configuration

Second transformer

Disconnected and removed LV and HV cables to lift transformer out and over fence.

We then swapped LV boxes from the old transformer to the new one, so we could keep the existing cable layout.

HV cables moved to reach new transformer connections.

 

Call Us Today: 01902 601 777 | 24Hour Emergency: 01902 601 777 opt 4

Case Studies

We take great pleasure from our history of customer satisfaction and the fact that our engineers have been around long enough to give the old school service and values that really puts customers first, which we feel is lacking within the industry, without compromising on new regulated guidelines.

Earth installation

posted: 15-10-2024

Rectifying issues identified during maintenance visit

read case study
Contact info

Call Us On: 01902 601777