Weekends works included a switchgear upgrade.
The old HV switches were very dated and couldn't be operated due to an electrical switching embargo.
We disconnected and removed old switch gear, drained, and disposed of insulating oil.
We installed the Bus Bar end box and 2no Schneider SF6 CE2 switches and all linking bars and boots.
All testing and commissioning carried out on completion.