Installation of a new bespoke section panel installed to rectify old pre-existing nonconformity.  We installed an 800A supply from a different source of supply and got cabling into position for a further planned shutdown. 

We installed two separate heavy duty industrial ladder racks suspended from the ceiling to allow for new cables to be installed.