This project involved the installation of two new 630A electrical supplies to support external chiller units at a commercial site. Following a detailed site visit, a tailored solution was developed to deliver robust, high-capacity power distribution while accommodating both internal and external installation constraints. The works were designed to ensure compliance, reliability, and minimal disruption to the client’s operations.

Objectives

  • Provide two independent 630A power supplies for new external chiller units
  • Install high-capacity cabling suitable for long-term operational reliability
  • Ensure safe, compliant routing of services both internally and externally
  • Integrate new supplies with existing infrastructure efficiently
  • Deliver a fully tested and commissioned installation 

Work Completed

  • Supplied all materials, plant, and equipment required to complete the installation
  • Installed 2 runs of 120mm 4-core SWA cables with separate CPC conductors per supply, routed to designated external locations near the wooden fencing
  • Carried out internal containment modifications to accommodate the new cable routes
  • Installed external containment systems along the steel frame and rear wall using a flexible foot mounting system, ensuring durability and alignment with site conditions
  • Mounted 2no 630A switches within IP-rated GRP enclosures at external connection points for safe and weather-resistant operation
  • Completed all necessary core drilling, penetrations, and fire stopping, maintaining the building’s fire integrity
  • Performed all cable terminations, ensuring secure and compliant connections
  • Conducted full testing and commissioning of the installation to verify performance and safety

Outcomes

  • Successful delivery of two fully operational 630A power supplies for chiller units
  • Seamless integration with existing electrical infrastructure
  • Installation completed to a high standard of safety, durability, and compliance
  • External systems protected against environmental conditions through IP-rated enclosures and robust containment
  • Future-proofed capacity for ongoing operational demands

Customer Benefit

  • Improved operational reliability with dedicated, high-capacity power supplies
  • Minimised risk through compliant installation, fire stopping, and certified testing
  • Enhanced system longevity
  • Reduced downtime and disruption through efficient planning and execution